One Alliance Center

One Alliance Center is a multitenant, twenty story office building with a 530,000 square foot parking deck that accommodates 1,650 vehicles.

Security

Video surveillance and access control systems for the twenty story building.

NFCU Heritage Oaks Campus Expansion, Buildings 5 and 6

Multi-building expansion of the Heritage Oaks campus. Buildings 5 and 6, two 165,000 square foot call centers, a 1,050 car parking deck, a recreation amenities building, an auditorium addition at Building 3, and a remote central energy plant. This project is pursuing LEED Silver certification.

Regions Bank Operations and Data Center

The Regions Bank Operations Center, formerly AmSouth Bank, is a Tier IV facility with 20,000 square feet of data center raised floor, office space with raised floor throughout, and redundant mechanical, uninterruptible power supply, and emergency power systems.

Central Plant

A central plant with four 800 ton chillers and provisions for two additional chillers serving the Regions Bank Operations Center.

Federal Reserve Bank of Atlanta Sixth District Headquarters

The Federal Reserve Bank of Atlanta Sixth District Headquarters building houses administrative offices, senior executive space, dining rooms and food service areas, a boardroom and an executive conference room, secure operations for currency, check operations, a 12,000 square foot data center, a high security vault, an indoor firing range, 189,000 square feet of parking space, and multi-use and support facilities.

Intelligent building systems include an integrated building management system master plan consisting of building automation, lighting control with facility-wide occupancy sensors, power monitoring systems, security and elevator management systems.

The headquarters building was the recipient of the Award of Excellence from Urban Land Institute Atlanta in 2003.

BlueCross BlueShield of Tennessee Cameron Hill Campus

The BlueCross BlueShield of Tennessee Cameron Hill campus comprises a 20,000 square foot Tier II data center, office buildings, amenities/food service facilities, three floors of conference rooms, and parking structures. Sustainable features include variable primary chilled water pumping, displacement ventilation, high efficiency centrifugal chillers, underfloor air distribution, an energy recovery wheel, water saving faucets, dual flush toilets, water saving urinals, and occupancy sensors. This project was the second largest LEED Gold accredited corporate campus in the country when certified.

AT&T Midtown Center Building I

Building I in the Midtown Center corporate office complex, a sixteen story office building including resource rooms, retail space, a winter garden, as well as a 2,150 car parking deck.

The conference center in Building I is the recipient of an International Illumination Design Award of Merit from the Illuminating Engineering Society of North America, 2004.

AT&T Midtown Center Building II

Building II in the Midtown Center corporate office complex, an eight story office building, including resource rooms, retail space, a conference center, and cafeteria. Additionally, the building includes five floors prepared for high density equipment loads.

The conference center in Building I is the recipient of an International Illumination Design Award of Merit from the Illuminating Engineering Society of North America, 2004.

AT&T Lindbergh Center

The Lindbergh Center corporate office complex, comprising two fourteen story office buildings with resource rooms, retail spaces, and a winter garden.

This project received the TOBY Award, “The Office Building of the Year,” Corporate Office Building Category from BOMA, Atlanta in 2007.

NFCU Heritage Oaks Campus, Building 3

A multi-building project on the Navy Federal Credit Union’s Heritage Oaks Campus. Building 2 is a 157,000 square foot, Tier II call center operating 24/7. Building 3 is a 163,000 square foot office building housing administrative office space, a recording studio for in-house training programs, and amenities including a fitness center, a health clinic, a library, and food service and dining areas. Parking Deck 1 is 435,000 square foot and accommodates 1,000 vehicles as well as the 14,000 square foot Central Energy Plant 1, which provides chilled water, normal and emergency power, and fire protection water services to support the entire campus. Sustainable features include daylight harvesting, variable speed fans, variable speed pumps, variable electric heat, airside enthalpy economizer, waterside economizer, low flow plumbing fixtures with automatic sensors, storm water collection and detention for use in site irrigation, and high filtration variable underfloor air delivery displacement at depressed humidity. The campus is the first LEED Gold Commercial Corporate Campus recipient in the State of Florida.

NFCU Heritage Oaks Campus, Building 2

A multi-building project on the Navy Federal Credit Union’s Heritage Oaks Campus. Building 2 is a 157,000 square foot, Tier II call center operating 24/7. Building 3 is a 163,000 square foot office building. Parking Deck 1 is 435,000 square foot and accommodates 1,000 vehicles as well as the 14,000 square foot Central Energy Plant 1, which provides chilled water, normal and emergency power, and fire protection water services to support the entire campus. Sustainable features include daylight harvesting, variable speed fans, variable speed pumps, variable electric heat, airside enthalpy economizer, waterside economizer, low flow plumbing fixtures with automatic sensors, storm water collection and detention for use in site irrigation, and high filtration variable underfloor air delivery displacement at depressed humidity. The campus is the first LEED Gold Commercial Corporate Campus recipient in the State of Florida.