Renovation of 96,000 square feet, and an addition of 112,000 square feet to the Hollings Cancer Center. The facility houses research space, a vivarium, three CAT scanners, a simulator room, a linear accelerator, a tomography room, diagnostic and treatment areas, radiation oncology, chemotherapy, a pharmacy, phlebotomy, and administrative and support spaces. Shared equipment rooms include cold and warm rooms, a molecular imaging core, a drug metabolism and clinical pharmacology core, and a drug discovery core.
Retrocommissioning of the mechanical systems serving the renovation of, and addition to, the Hollings Cancer Center.
Communications systems for the Cancer Center, including nurse call and a structured cabling system.
A public safety simulation complex at the Eastern Wake Campus, including a 4D immersive interior
A complex of Poultry Science instruction and research facilities, including instructional
A phased STEM research complex consisting of two connected buildings to support innovative
Renovation of the historic Terrell Hall, a 32,700 square foot residence hall constructed in
A single story clinic and research building. The building contains a clinic area with procedure,
A 133,750 square foot medical office building with a 473 vehicle parking deck, a 14,000 square foot
Renovations of two classrooms and a small lecture hall. This project facilitates the start of the
Acoustics, audio-visual, communications, and intelligent buildings systems for student-centered,
Renovation of the Business Service Annex to create the Delta Innovation Hub, housing maker space,
The Emory Musculoskeletal Institute provides innovative, comprehensive, patient and family-centered
An eight-story replacement hospital featuring 200 licensed beds, with a new 12,000 square foot
Renovation of the Engineering Department in the Wake Downtown campus building, including teaching