Multiple projects for Ortho Clinical Diagnostics including two new central chilled water plants to serve multiple interconnected buildings in a research complex housing laboratories, an animal colony, manufacturing, and administrative functions. Work includes demolition of multiple remotely located chillers and installation of new chillers located in the central plants, a chilled water distribution system, and elimination of CFC refrigerants. The plants are designed to accommodate a 120,000 square foot expansion; schematic drawings and airflow diagrams for four existing air handling systems serving ISO 7 cleanrooms, including air filtration, room pressurization, and ventilation requirements, for presentation to the FDA for new product licensing; and expansion of the RhoGAM process production facility including ISO 7 and ISO 8 cleanrooms requiring low temperature refrigerants, bulk nitrogen, compressed air, clean steam, and water for injection systems for pharmaceutical manufacturing.
Under Construction: A 111,000 square foot manufacturing facility, a 145,000 square foot warehouse,
Addition of a press room to Makita Corporation, a portable electric hand tool manufacturing
Multiple projects for JVC Corporation, a compact disc production facility, including the original
ZLB Plasma Services is a critical 24/7 plasma processing facility housing laboratories, an ISO 7
Suniva’s solar cell manufacturing facility is a two-line production and research facility
A melting and casting plant addition for YKK, as well as aluminum curtain wall and storefront
The Vehicle Processing Facility includes ten buildings handling 250,000 vehicles per year, on a 250
Multiple projects for Ortho Clinical Diagnostics including two new central chilled water plants to
Addition to and partial renovation of CSL Plasma, a critical 24/7 blood plasma processing facility.