SAS Institute Building A is a ten story high-rise office building with 990 individual offices, multiple two story atria, forty-five conference rooms, e-learning space, a 700 seat cafe, and a training center. The facility includes parking for 1110 cars. Building Q is a seven story high-rise research and development office building with 650 individual offices, a “Grab and Go” food service area, three two story atria, and thirty conference rooms. Sustainable features include high efficiency chillers, condensing hot water boilers, enthalpy wheel energy recovery units, demand controlled ventilation, toilet flushing, irrigation, and cooling tower makeup via municipal reclaimed water system, low-flow plumbing fixtures, lighting controls, photovolatics, LED lighting through the facility and the site, and extensive measurement and verification.
Redevelopment of three historic office buildings and a parking structure into a mixed-use area
Smart building systems, acoustics, security, communications, and lighting for a corporate
A thirty-five story mixed use development above three floors of underground parking. The building
A seven story Class A office building, including 138,300 square feet of office space, 21,400 square
Fit-up of tenant space on floors eight to nineteen of the Anthem Technology Center. This project is
Renovation of The Coca-Cola Company’s Atlanta Office Complex, including the North Avenue
Acoustics for the tenant fit-up of the Ninth and Tenth Floors at Centergy, including offices,
In Design: Specialty systems for the historic renovation of an office building to include open
Audio-visual systems and architectural acoustics for a six story headquarters building. The First
Architectural acoustics and acoustical commissioning for the Ninth, Tenth, and Eleventh floors of
Relocation of Inspire Brands / Arby’s Headquarters. Phase I includes Floors One, Two, Four,
Electrical, communications, and security systems for a twenty-one story, Class A shell office