A nine story parking deck for 1,300 vehicles, including ground floor space for a 11,700 ton central refrigeration plant and 8.4 MW emergency power plant with expansion capabilities to 19,500 tons and 14 MW. The plant is designed to serve the Miller School of Medicine. Because of the critical nature of the utilities, the major system components and structure are designed to sustain a Category 5 hurricane.
A public safety simulation complex at the Eastern Wake Campus, including a 4D immersive interior
A complex of Poultry Science instruction and research facilities, including instructional
A phased STEM research complex consisting of two connected buildings to support innovative
Renovation of the historic Terrell Hall, a 32,700 square foot residence hall constructed in
A single story clinic and research building. The building contains a clinic area with procedure,
Renovations of two classrooms and a small lecture hall. This project facilitates the start of the
Acoustics, audio-visual, communications, and intelligent buildings systems for student-centered,
Renovation of the Business Service Annex to create the Delta Innovation Hub, housing maker space,
Renovation of the Engineering Department in the Wake Downtown campus building, including teaching
Renovation of 2,300 square feet on the Tunnel Level and 10,000 square feet on Level Two of The Emory
Security, communications, and audio-visual systems for a science and nursing facility including a
Conversion of offices and classrooms in the HM Building to house a research laboratory and support