Renovation of The Coca-Cola Company’s Atlanta Office Complex, including the North Avenue Tower, the USA Building, the Technical Engineering Center, the Central Reception Building, Coca-Cola Plaza, Employee Center, and Learning Center. The renovation features the creation of a First Floor Main Street corridor throughout the campus, as well as work place, and guest and employee experience improvements, specifically common areas, conferencing suites, dining facilities, auditoriums, outdoor courtyards, and other amenities. This project achieved LEED Silver certification.
Communications systems include a distributed antenna system (DAS) and a structured cabling system.
Interior lighting for the renovation of the guest entry and guest waiting including brand and art lighting at the Coca-Cola Company’s Atlanta Office Complex. The lighting design involved multiple layers of light. The wall graphics are highlighted by perimeter cove and adjustable acccent luminaires. The queuing and security are lit by one continuous linear LED luminaire that turns the corner at the end of the hall, drawing you into the main guest waiting. The guest waiting has LED downlights. The feature of this space is a sculpture that is indirectly lit from a cove. Along the tufted seating, adjustable luminaires create a rhythmic scallop of light.
Security risk assessment and master planning. Security systems include integrated IP-based video surveillance for the site and within the building, access control and alarm monitoring systems, active shooter response systems, visitor screening and visitor management systems, optical turnstiles, and security communications systems comprising emergency call stations within the courtyards.
Intelligent Buildings scope includes a campus-wide smart building master plan. This consists of specifying a smart building platform, preparing the RFP for Master Systems Integrator selection and providing a sensor and metering masterplan for all future projects on the AOC. Realtime people-counting area sensors are utilized for space utilization calculations and optimizing HVAC for actual occupant loads.
Redevelopment of three historic office buildings and a parking structure into a mixed-use area
Smart building systems, acoustics, security, communications, and lighting for a corporate
A thirty-five story mixed use development above three floors of underground parking. The building
A seven story Class A office building, including 138,300 square feet of office space, 21,400 square
Fit-up of tenant space on floors eight to nineteen of the Anthem Technology Center. This project is
Renovation of The Coca-Cola Company’s Atlanta Office Complex, including the North Avenue
Acoustics for the tenant fit-up of the Ninth and Tenth Floors at Centergy, including offices,
In Design: Specialty systems for the historic renovation of an office building to include open
Audio-visual systems and architectural acoustics for a six story headquarters building. The First
Architectural acoustics and acoustical commissioning for the Ninth, Tenth, and Eleventh floors of
Relocation of Inspire Brands / Arby’s Headquarters. Phase I includes Floors One, Two, Four,
Electrical, communications, and security systems for a twenty-one story, Class A shell office