This mixed-use building transforms a former surface parking lot into a multipurpose facility housing admissions offices, a welcome center, a large presentation room, a bookstore, and a Starbucks coffee shop. The building sits above and in front of a new parking structure that houses 300 vehicles. Sustainable features include lighting controls and a green roof.
Renovations of two classrooms and a small lecture hall. This project facilitates the start of the
Acoustics, audio-visual, communications, and intelligent buildings systems for student-centered,
Redevelopment of three historic office buildings and a parking structure into a mixed-use area
Renovation of the Business Service Annex to create the Delta Innovation Hub, housing maker space,
A thirty-five story mixed use development above three floors of underground parking. The building
Renovation of the Engineering Department in the Wake Downtown campus building, including teaching
Renovation of 2,300 square feet on the Tunnel Level and 10,000 square feet on Level Two of The Emory
Security, communications, and audio-visual systems for a science and nursing facility including a
Conversion of offices and classrooms in the HM Building to house a research laboratory and support
Mechanical and electrical systems, as well as acoustics, audio-visual and lighting design for the
Facility condition survey and design of lighting and rigging systems for the 980 seat Russell