The Wallace Creek Regimental Complex comprises six barracks buildings, two battalion headquarters buildings, a warehouse, and vehicle maintenance, training, communications, armory, and dining facilities.
The primary electrical distribution system consists of 2.1 miles of 12.47kV aerial distribution. A single circuit is provided to serve the complex and the aerial system is designed to allow the installation of a second circuit to facilitate future expansion. The primary distribution extends underground from aerial system to feed pad-mounted transformers serving the 15 buildings which make up the complex. The aerial distribution system also includes pole mounted transformers and aerial secondary distribution to feed roadway lighting and parking lot lighting. The design of the system includes load calculation to verify that adequate capacity is available at the point of connection, sag and tension calculations, pole guy calculations.
Communications systems include interior communications cabling and outside plant copper and fiber cabling and infrastructure for telephone and data cabling systems.
Security systems include intercom, access control, intrusion detection, and video surveillance systems.
The Naval Station Norfolk Willis Manor Unaccompanied housing barracks is a five story residence
Two Warriors in Transition Unit Barrack buildings to house 144 soldiers each, located adjacent to
The Von Braun Complex – Phase III, an office building and conference facility supporting the
The high security ARCENT Third Army Headquarters comprises three components – the C2F (Command
A complex comprising the 34,800 square foot Daniel Rex Biddle Training Center Rescue Swimmer School,
The Naval Air Technical Training Center Complex, a ten building barracks complex including a galley,
The 108th ADA Brigade Complex includes two battalion headquarters buildings, two company operations
The Phase III addition to the System Software Engineering Annex (SSEA) hosts systems software
A three story 440 person bachelor enlisted quarters for the Navy Explosives Ordnance Disposal School
The Wallace Creek Regimental Complex comprises six barracks buildings, two battalion headquarters
The North Troop Medical and Dental Clinic, located in the 4th Infantry Brigade Combat Team complex,
Two five story, 600 person Advanced Individual Training barracks including company administration