Tag: Energy Efficiency

0 comments

The ENERGY STAR score places a number on how your building measures against peers in your location. Prior to August 26th, 2018, the peer building data came from the 2003 Commercial Building Energy Certification Survey (CBECS) — that’s more than 16 years old!  more

The 85,000 square foot Jay and Susie Gogue Performing Arts Center at Auburn University will feature two large performance venues. The building, which is pursuing LEED certification under the LEED-NC v2009 rating system, is projected to achieve significant energy cost savings when compared to a baseline building. more

For many of our new building projects, Owners ask about the expected energy costs of the proposed building so that they can financially plan for those costs. Benchmarking against the industry averages is a good first step. The table below, by the Pacific Northwest National Laboratory (PNNL), outlines the expected energy costs for code-compliant buildings of various occupancy types.
 more

 

“Entities should not be multiplied unnecessarily.”

– Franciscan friar William of Ockham

Among competing hypotheses, the one with the fewest assumptions should be selected. There are many interpretations of Occam’s Razor, a line of reasoning attributed to English philosopher William of Ockham, but put most plainly: the simplest explanation is usually right. Scientists, detectives, and doctors all use the razor to trim away improbable explanations and arrive at the truth.  more

Campus energy plants produce chilled water, heating water, steam and/or electricity to serve a group of buildings in a common location. These energy plants are a vital key in today’s quest to design buildings with higher energy efficiency, reduced carbon footprints, water saving features, and lower environmental impact. more

Willis Manor, named for the WWII Medal of Honor Winner, was procured as Design-Build P-123 Bachelor Quarters, Homeport Ashore Norfolk Naval Station (N40085-11-C-4572). The Clark Construction/LS3P design team was awarded the project as the first NAVFAC MIDLANT project evaluated for Total Ownership Cost (TOC). For the design-build team, P-123 represents the culmination of 12 years of involvement in design-build competition and delivery for NAVFAC and USACE. Many Clark Construction/LS3P projects have included BEQs and barracks, and the team has developed a wealth of knowledge in appropriate systems selection and implementation. more

Two years ago, I was invited to visit the Atlanta corporate campus of Assurant, Inc. to discuss their Energy Star score – it was too low and they wanted to do something about it. The twelve story office building was burdened by a chiller plant that was all original construction. Chillers, pumps, and cooling towers were well-maintained, but after more than 27 years of service, they were showing their age and not performing at the level they once did. This initial meeting unofficially began design efforts that have resulted in the recent completion of a $5.7 million upgrade to the HVAC and Electrical systems, a construction project that already has proven itself with lower electrical bills that bring a smile to Tony Ring, Manager of Maintenance Operations for Assurant.  more

0 comments

Selecting and specifying the optimal HVAC system to meet the Owner’s Project Requirements is critical to the success of a high performance project.  more

The movement to provide more sustainable school buildings continues to grow. At the same time, the Sept. 11, 2001, terrorist attacks and recent campus shootings are driving education institutions to construct safer campuses and more secure buildings. Although these movements appear to have little in common, they complement each other in several areas.  more