Phase I in an ultimately five building complex for multidisciplinary research and teaching including mechanical, electrical, aerospace, computer and industrial engineering. The building houses four tiered lecture halls, as well as other teaching classrooms, and office space for faculty and staff, including the Dean of the College of Engineering. Laboratory spaces in the building include several spaces with heavy computation equipment for simulations, and laboratories for software development, robotics, manufacturing design, student projects, computer, human computer interface, measurement research, and manufacturing processes.
A public safety simulation complex at the Eastern Wake Campus, including a 4D immersive interior
A complex of Poultry Science instruction and research facilities, including instructional
A phased STEM research complex consisting of two connected buildings to support innovative
Renovation of the historic Terrell Hall, a 32,700 square foot residence hall constructed in
A single story clinic and research building. The building contains a clinic area with procedure,
Renovations of two classrooms and a small lecture hall. This project facilitates the start of the
Acoustics, audio-visual, communications, and intelligent buildings systems for student-centered,
Renovation of the Business Service Annex to create the Delta Innovation Hub, housing maker space,
Renovation of the Engineering Department in the Wake Downtown campus building, including teaching
Renovation of 2,300 square feet on the Tunnel Level and 10,000 square feet on Level Two of The Emory
Security, communications, and audio-visual systems for a science and nursing facility including a
Conversion of offices and classrooms in the HM Building to house a research laboratory and support