The design-build delivery method was used for the U.A. Whitaker Biomedical Engineering Building at the Georgia Institute of Technology, and the schedule was aggressive: 18 months from beginning of design until substantial completion of construction. Although Leadership in Energy and Environmental Design (LEED) Green Building Rating System certification was not a project requirement, the building still has many green elements. This article describes how the design-build team incorporated green concepts into this non-LEED project, and highlights sustainable features of the architectural, electrical and HVAC systems.  more