Ortho Clinical Diagnostics

Multiple projects for Ortho Clinical Diagnostics including two new central chilled water plants to serve multiple interconnected buildings in a research complex housing laboratories, an animal colony, manufacturing, and administrative functions. Work includes demolition of multiple remotely located chillers and installation of new chillers located in the central plants, a chilled water distribution system, and elimination of CFC refrigerants. The plants are designed to accommodate a 120,000 square foot expansion; schematic drawings and airflow diagrams for four existing air handling systems serving ISO 7 cleanrooms, including air filtration, room pressurization, and ventilation requirements, for presentation to the FDA for new product licensing; and expansion of the RhoGAM process production facility including ISO 7 and ISO 8 cleanrooms requiring low temperature refrigerants, bulk nitrogen, compressed air, clean steam, and water for injection systems for pharmaceutical manufacturing.

Project Data
LOCATION ASSOCIATE ARCHITECT SIZE SERVICES CLIENT
Raritan, New Jersey The Henderson Design Group, Inc. 525,000 square feet Mechanical, Electrical, Plumbing, Fire Protection Ortho Clinical Diagnostics

Related Projects

Rinnai America Corporation Manufacturing Facility

Under Construction: A 111,000 square foot manufacturing facility, a 145,000 square foot warehouse,

Makita Corporation Press Room

Addition of a press room to Makita Corporation, a portable electric hand tool manufacturing

JVC Corporation

Multiple projects for JVC Corporation, a compact disc production facility, including the original

ZLB Plasma Services

ZLB Plasma Services is a critical 24/7 plasma processing facility housing laboratories, an ISO 7

Suniva Manufacturing Plant

Suniva’s solar cell manufacturing facility is a two-line production and research facility

YKK AP America, Inc.

A melting and casting plant addition for YKK, as well as aluminum curtain wall and storefront

Southeast Toyota at Westlake Vehicle Processing Facility

The Vehicle Processing Facility includes ten buildings handling 250,000 vehicles per year, on a 250

Ortho Clinical Diagnostics

Multiple projects for Ortho Clinical Diagnostics including two new central chilled water plants to

CSL Plasma Facility Addition and Renovation

Addition to and partial renovation of CSL Plasma, a critical 24/7 blood plasma processing facility.