A multibuilding expansion of the Heritage Oaks campus. This final phase of a multiyear master plan includes the 490,000 square foot Building 7, a 156,000 square foot Amenities Building, the 490,000 square foot Building 8, two 2,380-car parking decks, expansion of central equipment plant CEP2, and extension of the campus chilled water, power, fire protection water, and communication site utilities. Buildings 7 and 8 are high rise call centers with supporting training, conference, and breakrooms. Building 7 also contains a 15,000 square foot fitness center, a 500 square foot security operations center, a 4,500 square foot health clinic, and a high-density network equipment room with in-row cooling, clean agent fire suppression, and dedicated redundant UPS. The Amenities Building includes a 300-seat auditorium, multiple training rooms, production studio, and a café which includes a large kitchen and an 800-seat dining area. The expansion of CEP2 includes the addition of two 1,500-ton chillers and three 2,250-kW engine-generators. Upon completion of Building 8, the Heritage Oaks Campus provides space for 10,000 Navy Federal Credit Union employees. This project achieved LEED Certified certification.
Architectural acoustics and mechanical system noise control.
Access control, alarm monitoring, intercom, and video surveillance systems, as well as emergency call intercom systems. Security features include card readers at exterior and critical interior spaces, fixed and pan-tilt zoom cameras on interior and exterior sides of entrances and exits, building perimeters and campus site perimeter, emergency call stations with blue lights throughout the parking deck and a new 400 square foot Security Operation Center housing a 5 person security console that monitors the Heritage Oaks Campus, Corporate Office, and local branch security systems.
Redevelopment of three historic office buildings and a parking structure into a mixed-use area
Smart building systems, acoustics, security, communications, and lighting for a corporate
A thirty-five story mixed use development above three floors of underground parking. The building
A seven story Class A office building, including 138,300 square feet of office space, 21,400 square
Fit-up of tenant space on floors eight to nineteen of the Anthem Technology Center. This project is
Renovation of The Coca-Cola Company’s Atlanta Office Complex, including the North Avenue
Acoustics for the tenant fit-up of the Ninth and Tenth Floors at Centergy, including offices,
In Design: Specialty systems for the historic renovation of an office building to include open
Audio-visual systems and architectural acoustics for a six story headquarters building. The First
Architectural acoustics and acoustical commissioning for the Ninth, Tenth, and Eleventh floors of
Relocation of Inspire Brands / Arby’s Headquarters. Phase I includes Floors One, Two, Four,
Electrical, communications, and security systems for a twenty-one story, Class A shell office