Category: Solutions

0 comments

A master plan is a critical tool for any building owner. Most facilities management, design and construction professionals recognize the value of a master plan for a building or campus. A master plan focuses attention on the owner’s ultimate goals so that every facilities decision contributes to these goals. Some master plans, though, focus almost exclusively on architectural issues and do not adequately address engineering and infrastructure features. An engineering master plan, whether separate or as part of an architectural master plan, can allow building system and utility infrastructure decisions to be made within a framework that furthers the owner’s goals in a cost-effective and efficient manner. more

0 comments

Institutional Owners are groups who build, own, renovate, and maintain multiple buildings on a regular basis. These Owners are more likely to be interested in longer payback on initial building capital costs to achieve straightforward maintenance and lower energy consumption. They are sophisticated and know how they want their buildings and consultants to perform. These types of Owners may be in the business of higher education, aviation, healthcare, research, corrections, or corporate activities, among others. They may be public or private. They all have common needs that are different, and in most cases, more complex than those of other Owners. more

0 comments

The future of health care is now. Whether talking about hospitals, clinics, outpatient facilities, rehabilitation centers, or medical office buildings, these facilities are digital, include hotel-like amenities, and are equipped with intelligent building systems.  more

0 comments

As a result of the political and economic events of recent years, governmental revenues available for correctional facilities’ construction and operation have steadily declined. To continue providing value to our clients, correctional facilities designers must adapt to the constraints imposed by reduced funding. By providing high-value design services, creative engineering practices can keep both first costs and operating costs reasonable.  more

0 comments

Sound influences our daily lives regardless of its intent. Advancements in the field of acoustics have led to a more comprehensive understanding of the relevance of this science to our world. Effective, collaborative efforts, along with thoughtful design strategies, can result in an environment that enhances our perception, and ultimately our performance.  more

An electrical hazard analysis identifies dangers that are present in an electrical system. This starts at the building’s electrical service and continues through the electrical distribution system to the building loads, including panelboards, motors, safety switches, etc. This analysis should identify electrocution (shock) hazards, arc flash (burn) hazards and arc blast (pressure & shrapnel) hazards.  more

Willis Manor, named for the WWII Medal of Honor Winner, was procured as Design-Build P-123 Bachelor Quarters, Homeport Ashore Norfolk Naval Station (N40085-11-C-4572). The Clark Construction/LS3P design team was awarded the project as the first NAVFAC MIDLANT project evaluated for Total Ownership Cost (TOC). For the design-build team, P-123 represents the culmination of 12 years of involvement in design-build competition and delivery for NAVFAC and USACE. Many Clark Construction/LS3P projects have included BEQs and barracks, and the team has developed a wealth of knowledge in appropriate systems selection and implementation. more

Two years ago, I was invited to visit the Atlanta corporate campus of Assurant, Inc. to discuss their Energy Star score – it was too low and they wanted to do something about it. The twelve story office building was burdened by a chiller plant that was all original construction. Chillers, pumps, and cooling towers were well-maintained, but after more than 27 years of service, they were showing their age and not performing at the level they once did. This initial meeting unofficially began design efforts that have resulted in the recent completion of a $5.7 million upgrade to the HVAC and Electrical systems, a construction project that already has proven itself with lower electrical bills that bring a smile to Tony Ring, Manager of Maintenance Operations for Assurant.  more

1 comments

In this 21st century, it is truly amazing how quickly we can gather so much data with just a few mouse clicks! Our company database stores information for our 10,000+ projects, 4,500+ opportunity pursuits, 6,000+ companies, provides resume information for our 160+ employees, and even tells me that I have logged 51,665 hours to 344 Newcomb & Boyd projects (insert engineers and numbers jokes here).  more

1 comments

The National Fire Protection Association (NFPA) standard 96 clearly states the requirements for Type I grease hoods over commercial cooking equipment, but what are the requirements for hoods over domestic cooking equipment and how should we approach the installation of domestic cooking equipment in a commercial facility? more