Two years ago, I was invited to visit the Atlanta corporate campus of Assurant, Inc. to discuss their Energy Star score – it was too low and they wanted to do something about it. The twelve story office building was burdened by a chiller plant that was all original construction. Chillers, pumps, and cooling towers were well-maintained, but after more than 27 years of service, they were showing their age and not performing at the level they once did. This initial meeting unofficially began design efforts that have resulted in the recent completion of a $5.7 million upgrade to the HVAC and Electrical systems, a construction project that already has proven itself with lower electrical bills that bring a smile to Tony Ring, Manager of Maintenance Operations for Assurant.  more

The Centers for Disease Control and Prevention (CDC) is undergoing significant changes at its Atlanta campuses. With many of its buildings constructed in the 1950s and ’60s, the main campus now requires facility upgrades to improve its ability to fulfill its missions, which include being a national leader in research and response to the threat of bioterrorism. more

Despite the recent scrutiny and criticism of primary-secondary chilled water pumping systems, many owners still decide these systems are appropriate for their facility. Factors such as simplicity, familiarity, and experience are considered, in some cases, to have benefits to the owner that overshadow efficiency and first costs. Primary-Secondary pumping is not appropriate for all projects, but when the decision has been made to use it, properly addressing technical aspects of such designs and adequately addressing facility users’ needs significantly contributes to the project’s success. This article explores key issues to consider when designing a primary-secondary chilled water plant. more